1 Installing rafter and battens:
- Roof slope should be from 30º - 40º
- Space between battens should be devided from the top in equal gauge of 290mm-350mm depends on roof slope and the kind of roof deck. The balance will be left for the lowest row.
2Installing main tiles:
- Installing from the lowest row up to the top row
- From right to left
3Installing other tiles and accessories: in the following order
- Skylight tiles
- Gable and gable end
- Round ridge and round ridge end, round hip end
- 3-way and 4-way round apex
4Finishing and cleaning the roof by ECO paint